akobominerals.comCrawled Nov 17, 2026
The Segele Gold Deposit is a high-grade orogenic gold system in southwest Ethiopia, hosted in altered ultramafic rocks with steeply dipping mineralized lenses.
The Akobo Gold District in southwest Ethiopia features Precambrian to Neoproterozoic metamorphic rocks linked to gold mineralization.
Gold in the Akobo region was first documented during the Italian occupation of Ethiopia (1936–1941), with alluvial gold later attracting widespread attention.
Akobo Minerals follows the JORC Code for reporting exploration results, mineral resources, and ore reserves.
The Joru Prospect is a structurally controlled orogenic gold system near Segele, with mineralization hosted in quartz-carbonate veins within quartz-feldspathic rocks.
Akobo Minerals transitioned from exploration to gold mining, marking a milestone for the company and its stakeholders.
Mine Magazine published an article on gold mining in Ethiopia, featuring input from Akobo Minerals CEO Jørgen Evjen.
Akobo Minerals acquired three drill rigs from Protek Norr AB for 400,000 SEK, including three Diamec 262 core drill rigs and spare parts.
Recent drilling at Segele intersected visible gold over 205 meters, extending high-grade mineralization 50 meters deeper than previously known.
The Ethiopian Ministry of Mining and Petroleum provides an investment guide detailing the country’s mineral resources, geology, and regulatory framework for exploration.
The gold price in Swedish kronor reached record levels on Monday, peaking at 492.87 kr/g. This follows a long-term upward trend, partly driven by high dollar exchange rates.
Akobo Minerals contracted 3,000–5,000 meters of core drilling at the Segele and Joru gold prospects, with results expected in early 2020.
Akobo Minerals published a Competent Persons Report for its gold projects, compiled by Dr. Matt Jackson of BluestoneGEO.
Press release 12 February 2020 - Extremely high gold content in SegeleDownload
Drilling at Segele’s gold deposit revealed coarse-grained gold mineralization over a meter-wide interval in the third drill hole.
Press release 10 February 2020 - Visible gold in drill coreDownload
Board Of Directors
Management
Akobo Minerals is a Norway-based gold exploration and mining company listed on Euronext Oslo, with operations in Ethiopia’s Gambela region and Dima Woreda.
Gold mining in Ethiopia dates back centuries, with historical accounts linking the region’s alluvial gold to ancient trade routes.
Akobo Minerals upholds high corporate governance standards, prioritizing integrity, transparency, and stakeholder trust.
Akobo Minerals integrates environmental, social, and governance (ESG) principles into its gold projects in Ethiopia to support risk management and compliance.
Akobo Minerals focuses on gold exploration and mine development while maintaining a lean operational model, with a management team based in Scandinavia and local Ethiopian expertise.
Akobo Minerals emphasizes corporate social responsibility to support its mining exploration goals and operational progress.
Akobo Minerals began gold production at its Segele mine, one of the highest-grade deposits globally, following the establishment of a processing plant.
Akobo Minerals wins the **2022 ESG Explorer and Developer of the Year** award from *Mines and Money* at the **Mines and Money London conference**, Europe’s top mining investment event. This marks the company’s second consecutive year receiving recognition in the ESG category. The awards highlight Akobo’s commitment to environmental, sustainability, and governance standards in mining development.
Akobo Minerals releases a **3rd-party Gold Deposit Mineral Resource report** from **SRK Consulting**, confirming high-grade gold mineralization at its **Segele project**. The report follows CEO **Jørgen Evjen’s** Q1 presentation (May 23), where he highlighted progress on the **100th exploration drill hole**. Akobo’s high-grade mining initiative advances according to plan, backed by independent geological validation.
Akobo Minerals marks the start of its Segele gold mine development with a foundation-stone ceremony. The project advances toward production, with initial output targeted for late 2022 and scaling into 2023. At full capacity, the mine is projected to yield approximately 45,000 units annually.
Akobo Minerals renews its 182 km² exploration license in the Akobo region, ensuring continued mining and exploration activities. The renewal follows years of collaboration with the Ministry of Mines and ongoing efforts to advance operations. This move strengthens the company’s long-term position in gold production.
Akobo Minerals reports **no revenue** in Q4 2021 as it remains in project development. The company records a **net profit of SEK 0.22 million** driven by favorable foreign exchange adjustments. Operations continue without income generation as the company advances its development phase.
Akobo Minerals reports additional high-grade gold discoveries at its Segele mine development project. Laboratory testing confirms new bonanza zones, reinforcing the company’s ability to sustain peak production beyond initial estimates. CEO Jørgen Evjen cites the findings as validation of the project’s long-term viability.