Growth Drivers
Near-term growth for Broken Hill Mines depends on converting the expanded Rasp ore-feed mix into sustained throughput and grade gains, as shown by three ore feeds online, record quarterly ore throughput, and more than 100,000 ounces of silver for the first time, while October's early improvement provides the next operating indicator to watch.
During October month-to-date, Broken Hill Mines delivered improved grades and production.
Memo
Additional ore sources lifted throughput and silver output at the Rasp processing plant in New South Wales, supporting a near-term production-growth case for Broken Hill Mines, though sustained results depend on operating execution. The September quarter produced 102,922 ounces of silver, the highest quarterly total since June 2020, after ore from Main Lode and Pinnacles joined the historical Western Min source.
Pinnacles mining advanced toward higher-grade ore after reaching the base of the current pit, while lower-grade remnant material was processed during the quarter as part of pit clean-up activities. Development of the Rasp Tailings dewatering plant remained on budget and schedule, with availability expected in the first half of 2027.
Risk Factors
Pinnacles feed-grade performance is the key near-term execution exposure: lower-grade ore has already pulled recoveries marginally below the prior quarter, so any improvement depends on ore commissioning and optimisation continuing while feed grade rises. The pit has now reached the base of its current excavation, exposing higher-grade ore, although lower-grade remnant ore was still processed during the quarter as pit clean-up continued.
The Rasp Tailings Dewatering Plant remains under development, with availability scheduled for the first half of 2027.
Product Overview
Broken Hill Mines gives the Rasp operation an integrated ore-to-concentrate delivery path through its operating silver-lead-zinc mine in Broken Hill, New South Wales, which has a plant capacity of 750,000 tonnes per annum. The Rasp concentrator uses a single stage jaw crusher, a two stage grinding circuit, and sequential flotation separating valuable minerals from waste rock.
The processing plant produces lead-silver and zinc concentrates. Lead concentrate is sent to Port Pirie by rail, and zinc concentrate reaches the Port of Adelaide by rail for shipment to smelters globally.