DPO, via its subsidiary Cascade Digital Power, has closed on its acquisition of a controlling stake in another hydroelectric asset. The purchase was funded by an affiliate of Aegon Asset Management Real Assets. The asset has a nameplate capacity of over 10 MW and produces power on a year-round basis
DPO has secured land and firm power to build a $200mm AI data center that will run up to 20 MW of high-performance (AI) computing. The project utilizes stranded power and infrastructure in order to compress delivery timelines and put local hydro power to use. DPO has partnered with Billerud and its
DPO has announced a partnership with Schneider Electric to design and deploy modular high-density data centers directly on-site at renewable power generation assets. The first deployment is expected to be powered directly by wind turbines in Texas, and DPO expects to expand the strategy to other ren
DPO’s Andrew Webber was invited to speak by the USEA and Data Center Dynamics at two separate events, discussing how smaller-scale AI data centers can fulfill the demand for high-density rackspace while helping power producers manage where new loads are sited. RTO Insider Story Link DCD Connect
Digital Power Optimization builds and manages power-first flexible data centers at renewable power plants to maximize profitability of green power generation.