The substation build-out is the demand shift that can extend Energoaparatura's growth: Poland's 2025-2034 programme funds 28 new and 110 modernised transmission substations and 504 distribution power stations, and Energoaparatura's 2025 revenue rose 43.71% to 65.09 million from the previous year's 45.29 million. The transmission plan also includes the construction of 4,700km of new 400k Volt lines, and the agreements add the modernisation and construction of over 177 km of distribution lines plus nearly 58,000 remote reading meters.
PSE's plan earmarks PLN 64 billion at current prices for transmission networks across 2025-34, while PGE Dystrybucja's seven grant agreements with the National Fund for Environmental Protection and Water Management total nearly PLN 1.4 billion for modernising the electricity distribution network under the National Recovery Plan, and Energoaparatura signed a 71.3 million PLN net deal with Cementownia Warta to construct a main reception point, one 110kV cable line and 110kV GPZ2 switchgear for the 95MW Pajączno photovoltaic farm connection, including commissioning.
Working-capital absorption is the financing risk most likely to break Energoaparatura's thesis: current assets reached 68,293 thousand PLN at the end of 2025, made up 93% of total assets, and climbed 147% from the end of 2024, while inventory turnover rose 138% and receivables turnover rose 40% over the prior year.
Energoaparatura's management selects counterparties with strong and stable finances that settle payments on schedule.
Energoaparatura combines substation construction as general contractor, including energization formalities, with prefabricating control and distribution cabinets to the client's technical documentation and applicable industry norms and standards. The company served as general contractor on the 20/110kV GPO Janikowo Wiatraki substation at the Janikowo Wind Park, building, commissioning and handing over the facility along with the paperwork required to energize it.
Both individual cabinets and production series are produced by Energoaparatura. The firm gives individual attention to each project and technical support across all implementation stages.