Lekir Bulk Terminal
Lekir Bulk Terminal operates continuously with two berths (530m and 250m) and three ship unloaders, each with a 4,000 mt/hour capacity, supporting efficient goods transport.
integrax.com.myCrawled Nov 15, 2026
Lekir Bulk Terminal operates continuously with two berths (530m and 250m) and three ship unloaders, each with a 4,000 mt/hour capacity, supporting efficient goods transport.
Since 2021, Integrax Group expanded into maritime services at Stesen Janakuasa Tuanku Muhriz (SJTM), Negeri Sembilan, alongside internal restructuring to support new business objectives.
Integrax’s experience with Lekir Bulk Terminal, a key supplier to Malaysia’s largest power plant, supports its Engineering, Procurement, Construction, and Commissioning (EPCC) services for TNB Genco’s energy transition.
Integrax operates a multi-cargo dry bulk terminal through its subsidiary LBTSB, which unloads coal for SJSAS via associate company LMTSB.
The Group has achieved a significant milestone by diversifying beyond its core business in Manjung and expanding into the marine and maritime services industry in Jimah, Negeri Sembilan.
Shahrir Abdul Latiff served as Head of Technical Services at TNB Genco since its formation in October 2020, overseeing major maintenance services and optimizing the performance of its generating assets.
In 2015, Integrax became a subsidiary of Tenaga Nasional Berhad (TNB). The creation of TNB Power Generation Sdn Bhd (TNB Genco) led to Integrax’s restructuring under this new subsidiary, aligning with energy transition goals.
TNB Genco implemented an ISO 55001:2014-compliant asset management system for buildings, plants, and machinery in port and coal bulk terminal operations, maintaining certification since August 2015. Its LBTSB unit also holds a 2019 certification for marine facility security compliance.
Integrax upholds principles of good corporate governance, including transparency and accountability, to align business practices with long-term growth objectives.
Integrax became a wholly-owned subsidiary of TNB Genco in 2020, following its 2015 acquisition by Tenaga Nasional Berhad (TNB), and restructured to align with energy transition initiatives.