Mackay Gold & Silver is a Nevada gold and silver explorer controlling a unified Comstock District land package.
Mackay Gold & Silver holds district-scale land control across more than 7 km of strike spanning the Comstock Lode and the parallel Occidental-Brunswick Lode, an advantage rooted in the fact that fragmented ownership rather than geology had left large sections of the Comstock District virtually unexplored for over 100 years. Its consolidation removed that barrier to exploration.
Both phases of Mackay's exploration program target the 5-kilometer Occidental-Brunswick Lode, which runs parallel to the Comstock Lode and shares its strike and dip. The company acquires historic ground, drills it with modern methods, and aims to convert historical estimates into compliant resources for a possible heap-leach operation.
Mackay's growth could rise because shallow bulk-mineable gold at Occidental South fits the heap-leach route its model assumes. Mackay does not produce metal, and its model would convert historical estimates into compliant mineral resources. Its drill plans at Occidental South cover an approximately 1,000 by 400-meter gold-in-soil anomaly.
Drilling extended the Occidental South mineralized zone to roughly 550 meters, and the zone remains open for expansion; hole 26MGS007 intersected 59.4 meters at 1 gram per tonne gold and 9.45 grams per tonne silver.
Exploration results are the main risk to Mackay Gold & Silver's thesis because the company has no production revenue and none of its ground holds a current resource: its 2 to 3 million ounce gold target remains an aspiration, not a resource estimate, and the district's 8.2 million ounces of gold and 192 million ounces of silver produced between 1859 and 1926 are historical production totals rather than present resources.
Mackay Gold & Silver is fully financed, having raised roughly US$60 million in an April 2026 concurrent financing tied to its go-public transaction. Historical records describe the Sutro Tunnel interval as mineralized, though reported grades fell short of the 8 to 10 g/t gold cutoff used at the time, and no drill hole had followed up before Mackay's program.