PyroGenesis' growth rests on a $39.9 million backlog of signed and awarded contracts, essentially unchanged from $40 million at the end of Q2 as of November 12, 2026, and on the revenue it is already converting, with the first nine months of 2026 reaching $12.4 million, a 34% rise from $9.2 million in 2025. That backlog is expected to be recognized over 6 to 36 months as contractual obligations are completed.
Nine-month growth was led by torch-related products and services, up $2.4 million, followed by Spark at $1.7 million and U.S. Navy activities and DrossRite each at $0.7 million. Three new clients were secured across laser bed powder fusion, electron beam melting, and directed energy deposition, with two placing third orders after the quarter. The same client awarded PyroGenesis a contract valued at approximately $27 million (US$19.6 million) for a 20 MW plasma torch system, announced October 21, 2024.
PyroGenesis' subsidiary Pyro Green-Gas, through its Airscience Technologies division, was awarded a contract to provide syngas cleaning and hydrogen separation technology for a waste-to-hydrogen plant in India. Titanium powder orders included two orders of TI-64 coarse-cut powder from a U.S. applied research facility supported by the Department of Defense and NASA, two orders from a U.S. OEM serving directed energy deposition, and a fine-cut powder contract with a U.S. materials distributor that indicated potential for a monthly supply agreement of up to 1,000 kilograms.
PyroGenesis' backlog-conversion thesis remains exposed to persistent net losses and quarterly revenue that swings with project timing, as the nine-month 2026 net loss reached $5.4 million despite improving from the prior year while Q3 2026 revenue fell roughly 5% to $3.1 million from $3.2 million a year earlier because larger projects move through engineering, fabrication, delivery, installation, and commissioning with revenue recognized as performance obligations are satisfied across several quarters.
The ramp-up is a critical stage in commissioning ultra high-powered plasma torch systems, requiring a carefully managed progression through increasing power levels where operating power rises through controlled testing phases. Each phase assesses how the torch integrates with supporting equipment and client facility infrastructure before advancing to higher power levels and the ultimate goal of 4.5 MW.
Q3 gross margin improved to 35% from 24% in the comparative quarter, and the nine-month gross margin was 33% with $4 million of gross profit. For the first nine months, SG&A decreased to $9.3 million from $9.9 million.
PyroGenesis sells a salt-free DROSRITE process that recovers metal from dross, a waste generated in the metallurgical industry, by feeding hot dross as a batch into an argon-filled rotary tilting furnace to quench oxidation, offered through direct equipment sales or tolling services in which a smelter provides dross to be processed for a fee either on or off site.
PyroGenesis Additive converts traditional metals and alloys into spherical powders of high purity and makes specialty powders on an exclusive basis. One PyroGenesis contract covers design and build of a 4.5 MW plasma torch system and related peripherals. PyroGenesis announced on Nov. 09, 2026 a contract with a global aerospace leader for the supply of titanium powder produced by its NexGen plasma atomization process.