As of its Q3 2026 update, Sif Group's offshore wind foundation market turns against it before it turns for it: as turbines grow larger, demand keeps shifting toward next-generation monopile foundations, while Sif expected a slower 2027-2028, a return of supply-demand imbalance from 2029, and demand volumes to return only from the second half of 2029.
Sif reports urgency to accelerate offshore wind capacity across most European and Asian countries. From the second half of 2028 it sees an improving tender pipeline, dependent on projects being awarded to it.
Funding is the risk most capable of breaking Sif's case: the company states a material uncertainty over its ability to continue as a going concern on a 12-month view, tied to the 190 kton project and the search for short-term funding. Sif is exploring strategic options with its advisors alongside the funding talks, and its €50 million revolving credit facility will not be available during the negotiation period.
The client's final investment decision on the 190 kton project was still pending, with production then expected to start mid-2027. Sif is closing one of three production lines at Maasvlakte 2 from Q4 2026 and reducing Roermond operations from Q1 2027 to shift its order book into 2027.
Sif Group supplies tailor-made offshore wind foundations — monopiles, transition pieces, TP-less monopiles, pin piles and jacket legs — to wind farm developers, and combines manufacturing, engineering and logistics from initial design to the final lift at the quayside.
Sif monopiles are tubular steel structures up to 120 metres long, 11 metres in diameter and 2,000 tonnes in maximum weight. In 2023, Riviera reported that Sif's planned upgraded plant would enable production equivalent to 200 reference monopile foundations per year.