
Sinter runs a self-service quoting service producing FDM plastic parts, with in-house polymer tooling coming soon.
Tariffs are motivating more companies to reshore production while policy uncertainty delays investment decisions, leaving Sinter's sub-sector with rising domestic demand signals but deferred capital spending.
US plastics domestic shipments rose an estimated 1.2 percent in 2025 to $358.4 billion. The US moldmaking industry's trade deficit widened slightly from $1.3 billion in 2024 to $1.4 billion in 2025 as exports fell 4 percent and imports rose 0.2 percent. Apparent consumption of plastic products rose 1.7 percent in 2025 to $267.6 billion, with producer prices up 0.8 percent.
Sinter puts a floor under small orders with a $25 minimum on its Default schedule and a $20 minimum on its Economy schedule, a floor that Xometry's on-demand quote model does not impose. Xometry requires no minimums for on-demand capacity across any volume, process, or material.
Each uploaded model receives a quote that returns price, lead time, and ship date within minutes. If an order ships more than one full business day after its ship-by date, Sinter issues a credit of 10 percent of the parts price plus the corresponding tax.
The execution risk most capable of changing the thesis is a timing one: Sinter's planned move to faster mold production rests on next-generation polymer tooling that is still coming soon, so the speedup cannot yet be counted on. That tooling is designed and made in house, and it is meant to carry core and cavity work from a CAD file to the press in days.
Sinter builds and operates all production in house in SF. If a material is unavailable, the company declines new quotes in that material.
Sinter sells FDM plastic parts through a self-service pipeline over HTTP in which a buyer uploads a STEP or STL model and receives an instant priced quote with two lead times and a ship date in minutes. The buyer accepts the quote and places an order online or through an API while tracking it, with delivery on a Default schedule or an Economy schedule for a lower parts price.
PLA+ and PETG ship without material lead time in black or white, while other materials and colours add one day. Economy shipping leaves seven calendar days after the Default date at 20% off Default's parts price, with a $25 minimum for Default and $20 for Economy.