For buyers recovering exposed-fastener metal roofs that need purlin capacity, TopHat and Roof Hugger both raise the load-carrying capacity of the existing purlins beneath the roof. TopHat Subframe braces the purlins it fastens to, and independent AISI base tests measured higher uplift and gravity capacity from those same purlins, while TopHat calls a simpler notched Zee Strip usually the economical option for a plain reroof with no added load, distinguishing that case from added-load strengthening with Subframe.
Roof Hugger custom fabricates parts for non-standard conditions, including taller parts and special panel rib spacing.
TopHat Framing Systems has a project-specific case in metal-roof reroofs needing new structural capacity: its Subframe, fastened along each purlin, braces the purlin, and it has supplied multiple solar projects, provided each building passes an engineering review for its loads. Independent AISI base testing found greater uplift and gravity capacity in the same purlins. The Subframe can deliver a new roof plus added purlin capacity in one roof-installed pass when the reroof must carry solar arrays, sprinkler piping, rooftop units, or higher wind and snow design loads.
Metal-over-metal retrofit jobs can fall short of current wind-load requirements, add excess weight, or proceed without checking whether the existing structure is suitable.
TopHat Framing Systems' main execution risk is building-specific structural mismatch: a metal-over-metal retrofit can miss current wind loads, add unsuitable weight, or proceed without evaluating whether the existing structure is suitable, unless the existing structure is assessed and engineered for the project. Because cost-effective structural upgrades may require specialized knowledge, the company requires an engineer to review each retrofit and confirm that the existing purlins and frames can carry the new roof along with today's wind, snow, and added-equipment loads.
For projects with existing metal roofs, current wind uplift pressures may be significantly higher than when the building was originally built.
TopHat Framing Systems' retrofit framing lets a buyer put a new metal roof over an existing roof by fastening new framing through the old roof and into the building's existing purlins. The TopHat Subframe is a hat-section retrofit purlin built to carry a new metal roof above an old metal roof.
Popular sections ship from inventory, while other sections typically take about three weeks.